Trident Royalties PLC

Production

Equinox Gold Mercedes Offtake

Trident owns an offtake for 100% of the gold produced up to 58.5koz p.a. at Equinox Gold’s Mercedes Gold Mine and Greenstone Gold Project until March 1, 2027.

Equinox Gold Mercedes Offtake

Mercedes is a producing underground gold mine in Sonora, Mexico. The mine is expected to produce an average of c. 62koz p.a. from 2021-2025.

LocationMexico
OperatorEquinox Gold
CommodityGold
Mining MethodUnderground
StageProduction

Reserve Estimate (NI 43-101)

Mercedes Proven381kt @ 5.50g/t – 67koz
Mercedes Probable2Mt @ 3.60g/t – 258koz
Mercedes Total3Mt @ 3.90g/t – 325koz

Source: Equinox Gold